Business
Cabinet clears 7 railway projects to add 2,339 km to existing network

New Delhi, Aug 16
The Union Cabinet on Wednesday cleared seven railway projects with an estimated cost of Rs 32,500 crore, which will add 2,339 km to the existing network covering states namely Uttar Pradesh, Bihar, Jharkhand, West Bengal, Telangana, Odisha and Gujarat.
The projects, which include upgradation of the existing railway lines including their quadrupling and doubling, will facilitate capacity generation for movement of 120 million tonnes of extra cargo and will also help travel of migrant workers and students, Railway Minister Ashwini Vaishnaw told reporters after the Cabinet meeting.
The projects will receive 100 per cent funding from the Central government and connect major industrial and commercial hubs of the country.
They will help increase the existing line capacity, smoothen train operations, reduce congestion and facilitate ease of travelling and transportation, the minister said.
The details of the projects are as follows: Doubling of existing Gorakhpur Cantonment (Valmiki Nagar single line section) in Uttar Pradesh (Gorakhpur, Maharajganj, Kushi Nagar) for 89.264 km, and Bihar (West Champaran) for 6.676 km.
Doubling of existing Guntur-Bibinagar single-line section in Andhra Pradesh (Guntur) for 1 km, and Telangana (Nalgonda, Yadadri Bhuvanagiri) for 139 km.
Doubling of existing Chopan-Chunar single-line section in Uttar Pradesh (Mirzapur, Sonbhadra) for 101.58 km.
Doubling between Mudkhed-Medchal and Mahbubnagar-Dhone section in Maharashtra (Nanded) for 49.15 km, Telangana (Nizamabad, Kamareddy, Medak, Wanaparthy, Jogulamba, Medchal-Malkajgiri) for 294.82 km, and Andhra Pradesh (Mahbubnagar, Kurnool and Dhone) for 73.91 km.
Quadrupling between Samakhiali and Gandhidham in Gujarat (Kutch) for 53 km.
Third line between Nergundi-Barang and Khudra Road-Vizianagaram in Odisha (Bhadrak, Jaipur, Khordha, Cuttack, and Ganjam) for 184 km, and Andhra Pradesh (Srikakulam, Vizianagaram, Visakhapatnam) for 201 km.
Son Nagar-Andal multi-tracking project in Bihar (Gaya, Aurangabad) for 132.57 km, Jharkhand (Dhanbad, Giridih, Hazaribagh, Koderma) for 201.608 km, and West Bengal (Paschim Bardhman) for 40.35 km.

3 hours ago
US H-1B visa fee unlikely to dent IT companies’ margins significantly: Report

3 hours ago
US again clarifies Trump's H-1B proclamation, says existing visa holders not impacted

3 hours ago
Former X executive defends H-1B workers, slams anti-immigrant posts on X

3 hours ago
In new geopolitical context of US Tariffs, Brazil calls for closer ties with India

5 hours ago
U.S. H-1B visa policy raises concerns; China introduces ‘K Visa’ to attract young professionals

5 hours ago
‘Shield Seniors’ app against online fraud; Indian student wins TIME magazine award

6 hours ago
Khalistani extremist and close aide of terrorist Pannun arrested in Canada

6 hours ago
Piyush Goyal in Washington for India-US trade talks

7 hours ago
Armed robbers loot over Rs 1 crore from HDFC Bank in Jharkhand’s Madhupur

7 hours ago
No relief by SC for Jacqueline Fernandez in the Rs 200 crore money laundering case

7 hours ago
SC to examine PIL for enhanced transparency in Air India crash probe

9 hours ago
Hindus seek “Hindu Mandir” at JFK Airport

9 hours ago
‘Kantara: Chapter 1’ trailer blends cinema and culture setting the stage for thrilling prelude