Business
Tajpur Port will require huge investment to reach 12 metre draft

Kolkata, Sep 26
How will a deep-drafted port at Tajpur in West Bengal's East Midnapore district, impact Haldia Dock Complex (HDC) -- a port facility under Syama Prasad Mookerjee Port (SMP), Kolkata? The state cabinet has already cleared the issuance of a Letter of Intent (LOI) for development of a port at Tajpur to Adani Ports and Special Economic Zone (APSEZ) Ltd.
It remains to be seen when APSEZ Ltd accepts the proposal. However, one thing is clear. A sustainable port facility at Tajpur will involve huge investment.
"It will be an expensive port and charges will have to be high in order to recover costs. An investment of nearly Rs 10,000 crore will be required, just to attain 12 metres of draft. Capital dredging will be required to create a channel apart from the building of a dyke. Even after that, maintenance dredging will be required every year. This will cost Rs 250-300 crore annually," a senior port official said.
Draft near the shore at Tajpur is barely 4-5 metres. It increases to about 12 metres 7-8 km into the sea.
A draft of 12 metres will enable only Panamax vessels, with a parcel load of 70-80,000 tonnes, to access the port. To handle Cape Size vessels, with parcel loads of 100,000 tonnes, a draft of 15 metres will be required. For this, one would have to move further away from shore.
"HDC has a draft of about 8.5 metres. There isn't too much difference between this and 12 metres. Nowadays, importers do not unload cargo at one port. They use two ports. Sometimes, its Paradip and Dhamra. Otherwise, it is Dhamra and Haldia. This is to avoid congestion. After all, evacuation of cargo after it's taken off the ship is very crucial.
"Haldia has very good rail and road links and is preferred by importers. No wonder, HDC continues to handle Panamax vessels that have unloaded part of the cargo at Paradip or Dhamra. HDC also handles Cape Vessels at the Sandheads and Sagar anchorage," the official added.
Tajpur's success will depend on several factors. One of these is the increase in cargo.
The Centre wants a major rise in cargo handling by 2025. So long as there is sufficient cargo, every port facility can enjoy a substantial share, including the proposed Subarnarekha port in Odisha's Balasore.
Port charges will matter though. APSEZ Ltd will be mechanising Berth 2 at HDC at a cost of over Rs 298 crore. The rate it proposes to offer shippers is extremely competitive.

12 hours ago
H-1B Visa Fee only for new petitions, not renewals: White House

18 hours ago
Australian study unlocks secrets of ancient life through fossil faeces

18 hours ago
Nepal: Interim PM Karki has to rebuild public trust in governance

18 hours ago
Afghan senior official slams Trump's remarks on Bagram airbase

18 hours ago
Tech giants urge H-1B holders to stay in US after Trump's visa overhaul, ask those abroad to return to US

18 hours ago
CoHNA celebrates end of DOJ investigation on BAPS temple

18 hours ago
Not only US, several countries are restricting entry

18 hours ago
US decision on H-1B visa fee hike likely to have humanitarian consequences: Govt

18 hours ago
US experts warn Trump administration against undermining relationship with India: Report

21 hours ago
Our foreign policy, diplomacy have completely failed: Imran Masood slams govt after Prez Trump’s H-1B visa fee hike

21 hours ago
Congress criticises US President Trump, Centre's policies over H-1B visa fee hike

21 hours ago
Miami City Commission will open with hymns from Rig-Veda, Upanishads, Bhagavad-Gita

22 hours ago
The great American dream may now be too expensive to achieve