Business
Power Grid pitches for obsolete tech in smart electricity meters, can hamper 5G dream

New Delhi, Aug 29
As India gears up to launch 5G services in October, state-run Power Grid Corporation of India (PGCIL) is still going ahead with dated, obsolete technology to install one crore smart electricity meters, which can put electricity sector reforms in jeopardy.
The technology currently in focus is the latest platform and connectivity solution called Narrow Band Internet of Things (NB-IoT) that can work with 4G and 5G networks.
Tata Power Delhi Distribution, which supplies electricity in north and north-west Delhi, already uses NB-IoT in smart meters that collect and track the electricity consumption of a unit or a system that they are connected to.
The PGCIL first floated a smart metering tender for the smart meters based on older and dated second generation (2G) and RF mesh frequency in March.
Later, the PGCIL modified the tender to include NBIoT technology.
However, there was another revision in the bid on August 18, where the new and 5G-ready NB-IoT technology was again excluded by the central transmission utility.
NB-IoT is a cellular communication technology which is accepted globally. It provides enduring cellular technology in 4G as well as 5G deployments and is better for use in high-rises, basements and rural installations of machine-to-machine applications.
According to industry sources, the motivation to exclude NB-IoT for smart meters is "unclear given that NB-IOT is the latest state of the art technology and is future proof".
One reason that the Power Grid did not go for NB-IoT technology can be that it is not yet widely proven on a mass scale.
The government has recently concluded a highly successful auction for 5G spectrum and the country is on the threshold of seeing the launch of M2M and other 5G applications.
Prime Minister Narendra Modi has consistently been emphasising the importance and necessity of launch of 5G services.
According to industry sources, when the capability to offer the latest technology exists in the country, it is a highly "retrograde step" for a PSU to make a backward move and exclude the technology from its tender.
They said that it is essential that the latest technology be deployed into the power sector in order to ensure longevity of the systems being put into place.
Ignoring the latest technology defeats the very idea of modernisation, they added.
The Ministry of Power recently launched a Revamped Distribution Sector Scheme (RDSS) programme which aims to roll out smart meters to 250 million customers by 2025.

37 minutes ago
BAPS Sanstha welcomes decision on closure of investigation, creation of Swaminarayan Akshardham

38 minutes ago
Trump again claims credit for India-Pakistan cesssation of hostilities

40 minutes ago
US Justice Department urges SC to allow firing of Federal Governor Lisa Cook

41 minutes ago
IMF proposes US Treasury official as first deputy managing director

42 minutes ago
Family of Telangana techie shot dead by US Police demands justice

43 minutes ago
US return to Bagram faces logistical, diplomatic challenges

44 minutes ago
China Committee Chairman meets Indian Envoy to US, hails India as ‘essential partner’

44 minutes ago
Trump says US 'trying' to retake key Afghan air base

47 minutes ago
India’s smartphone market grows 2 pc in 1H25: Report

48 minutes ago
SoftBank's Vision Fund to lay off 20 pc of its workforce to focus on AI

49 minutes ago
Mission Saksham Anganwadi, Poshan 2.0 to boost nutrition of children & pregnant women: PMO

50 minutes ago
Free medical camps organised nationwide; special focus on women's health in Gandhinagar

51 minutes ago
NHRC seeks report on 'very bad condition' of govt health centre in MP's Jabalpur